Ceiling repair
Contents |
[edit] Introduction
Ceiling cracks can be caused by issues such as:
- Changes in the temperature.
- Settlement.
- Additional weight from extensions or other renovations.
- Other structural changes.
[edit] Dealing with cracks
Depending on the size and severity of ceiling cracks, three questions may arise:
- Is this cause for concern?
- How much will it cost?
- Is professional repair required?
It's a good idea to monitor ceiling cracks to know how and when to repair them. If a ceiling crack is accompanied by a wall crack, or it is rather large, this may justify professional repair assistance or to seek advice about possible structural problems.
If the ceiling crack has impacted cornice work, or a ceiling rose, this will have an impact on the project as well, since it will be necessary for the repair to stay consistent with other rooms.
[edit] The repair process
The composition of the ceiling should be checked before a repair project is attempted. Once the composition of the ceiling is established, there are several steps in the repair process.
The following tools are recommended for a project of this type:
- Plaster knife.
- Ceiling crack repair tape.
- Lightweight, fast drying filler.
- Paintbrush or roller, paint tray, tape, drop sheet.
- Ceiling paint (preferably a colour that already matches the ceiling).
- Protective equipment.
- Spirit level to test if the crack falls between two separate surfaces.
[edit] The repair method
To clean and tape the ceiling crack:
- Scrape away any dried paint or debris from the crack, going back to sound plaster.
- Use a damp cloth to clean the area.
- Let the area dry.
- Apply reinforcement if necessary such as crack repair tape.
- Apply a first coat of filler such as bonding to patch the crack.
- If bonding is used on larger areas, score the bonding to give a key for the next coat of filler to adhere to.
- Wait for the filler to dry.
- Smooth the area.
- Apply a second coat of finishing filler.
- Wait for the filler to dry.
- Sand the ceiling surface.
- Clean down the surface to remove any dust.
- Prime the surface.
- Paint the ceiling.
Labour rates vary, depending on what is included in the scope of work. Will it include painting the repair and removing any rubbish? The price of the repair project may also depend on the level of complexity.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.

























